COUNTY |
Grant |
|||
|
ROUTE |
CS 4009 |
|||
| DISTRICT | 6-Covington | |||
| ITEM NO | 6-1059.00 | |||
|
PROJECT DESCRIPTION |
Replace bridge and approaches on Stringtown Road in Corinth over Norfork Southern Railroad (C11) 0.1 miles east of Jct. US 25. |
|||
| PROJECT MANAGER | John Eckler, P.E.
|
|||
|
USER DIVISION |
Highway Design |
|||
| APPROXIMATE FEE | $200,000 | |||
| PURPOSE AND NEED | Improve
safety and maintain mobility for the community. The bridges have low sufficiency
ratings that warrant replacement. |
|||
|
PROJECT SCHEDULE & MILESTONES |
RESPONSE DATE |
May 3, 2005 4:30 P.M. (Frankfort Time) | ||
|
SELECTION COMMITTEE DATE FIRST MEETING |
May 17, 2005 |
|||
| PRE-DESIGN CONFERENCE | June 1, 2005 | |||
|
TENTATIVE DEADLINE FOR CONSULTANT FEE PROPOSAL |
June 15, 2005 |
|||
|
CONTRACT NEGOTIATIONS |
June 29, 2005 |
|||
| NOTICE TO PROCEED | July 13, 2005 | |||
| PRELIMINARY LINE & GRADE | December 1, 2005 | |||
| FINAL JOINT INSPECTION | June 1 2006 | |||
| RIGHT OF WAY PLANS | August 1 2006 | |||
| FINAL ROADWAY PLANS | June 1 2007 | |||
The
selected consultant is expected to meet the scheduled milestone dates. |
||||
| EVALUATION
FACTORS |
75% - 100% of work accomplished in Kentucky offices – 2 points 26% - 74% of work accomplished in Kentucky offices – 1 point 0% - 25% of work accomplished in Kentucky office - 0 points |
|||
|
SELECTION COMMITTEE MEMBERS |
|
|||
|
DBE REQUIREMENT |
None | |||
|
SPECIAL INSTRUCTIONS |
The Department reserves the option to modify the selected consultant’s agreement to include any necessary services for this project. The firm(s) will ask that time be prequalified by the Department in the required area(s).
|
|||
| SCOPE | The selected consultant will provide engineering services for preliminary and final roadway design including any surveying, drainage design, traffic control, erosion control. Advanced Situation Folders, structure plans, right-of-way plans, and construction plans with construction cost estimates. |
|||
| AVAILABLE KYTC STUDIES | N/A | |||
| PROJECT LENGTH | 0.3 Miles |
|||
| METHOD OF DESIGN | X English Units X CADD Capability (with DGN Intergraph Design File Format) X CADD Based Automated Highway Design System X Digital Terrain Modeling
|
|||
| ENVIRONMENTAL | Department shall perform Service. | |||
| PHOTOGRAMMETRIC SERVICES | N/A | |||
| STRUCTURE DESIGN | Consultant
shall perform Service. |
|||
| GEOTECHNICAL SERVICES | Department shall perform Service. |
|||
| PROJECT FUNDING | BRZ | |||
| TRAFFIC | Department
shall perform Service. |
|||
| PREQUALIFICATION REQUIREMENTS | The project team shall be prequalified in all areas as follows:
|
|||
| MAP |
|
|||