COUNTY |
Boyle |
|||
|
ROUTE |
CR 5230 |
|||
| DISTRICT | 7-Lexington | |||
| ITEM NO | 7-1113.00 | |||
|
PROJECT DESCRIPTION |
Preliminary design and Final design for a bridge and approaches over North Rolling Fork River. |
|||
| PROJECT MANAGER | I. J. Blankenship, P.E.
|
|||
|
USER DIVISION |
Highway Design |
|||
| APPROXIMATE FEE | $75,000, (Lump Sum) | |||
| PURPOSE AND NEED | Replace
deficient structure. |
|||
|
PROJECT SCHEDULE & MILESTONES |
RESPONSE DATE |
May 3, 2005 4:30 P.M. (Frankfort Time) | ||
|
SELECTION COMMITTEE DATE FIRST MEETING |
May 17, 2005 |
|||
| PRE-DESIGN CONFERENCE | June 1, 2005 | |||
|
TENTATIVE DEADLINE FOR CONSULTANT FEE PROPOSAL |
June 15, 2005 |
|||
|
CONTRACT NEGOTIATIONS |
June 29, 2005 |
|||
| NOTICE TO PROCEED | July 13, 2005 | |||
| PRELIMINARY LINE & GRADE | November 1, 2005 | |||
| FINAL JOINT INSPECTION | December 1, 2005 | |||
| RIGHT OF WAY PLANS | February 1, 2006 | |||
| FINAL ROADWAY PLANS | February 1, 2007 | |||
The
selected consultant is expected to meet the scheduled milestone dates. |
||||
| EVALUATION
FACTORS |
75% - 100% of work accomplished in Kentucky offices – 2 points 26% - 74% of work accomplished in Kentucky offices – 1 point 0% - 25% of work accomplished in Kentucky office - 0 points |
|||
|
SELECTION COMMITTEE MEMBERS |
|
|||
|
DBE REQUIREMENT |
None | |||
|
SPECIAL INSTRUCTIONS |
The Department reserves the option to modify the selected consultant's agreement to include any necessary engineering and /or related services for this project. The firm(s) will at that time be prequalified by the Department in the required area(s). |
|||
| SCOPE | The selected consultant will provide engineering services for Phase I and Phase II roadway design. |
|||
| AVAILABLE KYTC STUDIES | N/A | |||
| PROJECT LENGTH | .10 Miles |
|||
| METHOD OF DESIGN | X CADD Capability (with DGN Intergraph Design File Format) X Digital Terrain Modeling
|
|||
| ENVIRONMENTAL | Department shall perform Service. | |||
| PHOTOGRAMMETRIC SERVICES | Department shall perform Service. | |||
| STRUCTURE DESIGN | Consultant
shall perform Service. |
|||
| GEOTECHNICAL SERVICES | Department shall perform Service. |
|||
| PROJECT FUNDING | Federal Funds (BRZ) | |||
| TRAFFIC | Department
shall perform Service. |
|||
| PREQUALIFICATION REQUIREMENTS | The project team shall be prequalified in all areas as follows:
|
|||
| MAP | ||||