PROJECT DESCRIPTION |
Replace bridge and approaches over Plum Fork (B24) 4.4 miles N. Jct. KY 827. |
|||
| PROJECT MANAGER | Darrin Eldridge
|
|||
|
USER DIVISION |
Highway Design |
|||
| APPROXIMATE FEE | $100,000 | |||
| PURPOSE AND NEED | The
primary purpose of this bridge replacement project is to replace the bridge
and approaches on KY 7 over Plum Creek approximately 4.4 miles North of
the junction with KY 827 in order to improve the safety of the traveling
public. KY 7 is an important route for those wanting to access US 23 to
the North, KY 10 to the East or West, and Interstate 64 in Olive Hill,
KY. This project is needed because the existing structure has a sufficiency
rating of 41.4/100.0, which indicates that it is deficient. KYTC’s
policy is to consider replacement of structures when their sufficiency
rating falls below 50.0/100.0. The existing double barrel 10x10x54 feet
reinforced concrete culvert is structurally deficient as evidenced by
heavy erosion at the north upstream embankment. Poor channel alignment
is forcing flow into the embankment and is encroaching upon the roadway.
All normal flow is through the south barrel due to the silt/debris in
the north barrel. Additionally, the south upstream and the north downstream
wingwall is completely gone. A small scour hole (approximately 20 inches
deep) is present at the outlet end of the south barrel. Barrels have moderately
sized cracks in walls and ceilings, with some spalling and exposed steel.
The south barrel walls have some areas of honeycombing. The inverts have
areas of concrete erosion and the headwalls have areas of honeycombing
and spalling with exposed steel. |
|||
|
PROJECT SCHEDULE & MILESTONES |
RESPONSE DATE |
March 29, 2005 4:30 P.M. Frankfort Time | ||
|
SELECTION COMMITTEE DATE FIRST MEETING |
April 20, 2005 |
|||
| PRE-DESIGN CONFERENCE | May 4, 2005 | |||
|
TENTATIVE DEADLINE FOR CONSULTANT FEE PROPOSAL |
May 18, 2005 |
|||
|
CONTRACT NEGOTIATIONS |
June 1, 2005 |
|||
| NOTICE TO PROCEED | June 15, 2005 | |||
| PRELIMINARY LINE & GRADE | April 1, 2006 | |||
| FINAL JOINT INSPECTION | November 1, 2006 | |||
| RIGHT OF WAY PLANS | March 1, 2007 | |||
| FINAL ROADWAY PLANS | October 1, 2008 | |||
The
selected consultant is expected to meet the scheduled milestone dates. |
||||
| EVALUATION
FACTORS |
75% - 100% of work accomplished in Kentucky offices – 2 points 26% - 74% of work accomplished in Kentucky offices – 1 point 0% - 25% of work accomplished in Kentucky office - 0 points |
|||
|
SELECTION COMMITTEE MEMBERS |
|
|||
|
DBE REQUIREMENT |
None | |||
|
SPECIAL INSTRUCTIONS |
The Department reserves the option to modify the selected consultant’s agreement to include any necessary services for this project. The firm(s) will be asked at that time for prequalificans by the Department in the required area(s).
|
|||
| SCOPE | 1. Conduct preliminary engineering studies to identify appropriate typical section, line and grade, and dependable cost estimate. The environmental document at this time is expected to be a CE Level 1 which will be done by district. 2. The selected Consultant will be required to provide engineering services to perform Phase II roadway design, including the preparation of any design studies, drainage design, right of way plans, construction plans, traffic control plans and cost estimates.
|
|||
| AVAILABLE KYTC STUDIES | N/A | |||
| PROJECT LENGTH | 0.1 Miles |
|||
| METHOD OF DESIGN | X CADD Capability (with DGN Intergraph Design File Format) X CADD Based Automated Highway Design System X Digital Terrain Modeling
|
|||
| ENVIRONMENTAL | Department shall perform Service. | |||
| PHOTOGRAMMETRIC SERVICES | Department shall perform Service. | |||
| STRUCTURE DESIGN | The
selected consultant shall do the necessary engineering services to submit
to the Kentucky Transportation Cabinet an Advance Situation folder(s)
for the appropriate applicable structure(s). Upon submission of the folder(s),
a determination will be made whether the structure design will be performed
by the Department or by the consultant. Prequalification in the area of
structure design is required to be identified in the consultant's Response
to Announcement. |
|||
| GEOTECHNICAL SERVICES | Department shall perform Service. |
|||
| PROJECT FUNDING | Federal Funds | |||
| UTILITY DESIGN | The
selected consultant may be requested to provide utility related services
for this project, which may include construction inspection. |
|||
| TRAFFIC | Traffic
projections and related information will be provided by the Department. |
|||
| PREQUALIFICATION REQUIREMENTS | The project team shall be prequalified in all areas as follows:
|
|||
| MAP |
|
|||