COUNTY |
Carter |
|||
|
ROUTE |
KY 1959 |
|||
| DISTRICT | 9-Flemingsburg | |||
| ITEM NO | 1065.00 | |||
|
PROJECT DESCRIPTION |
Replace bridge and approaches over Everman Creek (B03) 0.1 mile S. Jct. KY 7. |
|||
| PROJECT MANAGER | Doug Gesso
|
|||
|
USER DIVISION |
Highway Design |
|||
| APPROXIMATE FEE | $100,000 | |||
| PURPOSE AND NEED | The
primary purpose of this bridge replacement project is to replace the bridge
and approaches on KY 1959 over Everman Creek approximately 0.1 mile South
of the junction with KY 7 in order to provide a safe, reliable roadway
for those wanting to access KY 7. This project is needed because the existing
structure has a sufficiency rating of 47.8/100.0, which indicates that
it is deficient. KYTC’s policy is to consider replacement of structures
when their sufficiency rating falls below 50.0/100.0. The structurally
deficient existing bridge is comprised of 3- 13x13x13 feet reinforced
concrete slab units with 0-degree skew, which are placed on timber piles.
The timber piles are cracked and split. Hammer sounding of these piles
shows evidence of deterioration. A large scour hole is present around
the timber piles. The joints between the concrete slabs are sealed with
bituminous sealant, which is allowing seepage. Concrete railings and posts
have several spalls with exposed rebar. |
|||
|
PROJECT SCHEDULE & MILESTONES |
RESPONSE DATE |
March 31, 2005 4:30 P.M. Frankfort Time | ||
|
SELECTION COMMITTEE DATE FIRST MEETING |
April 21, 2005 |
|||
| PRE-DESIGN CONFERENCE | May 5, 2005 | |||
|
TENTATIVE DEADLINE FOR CONSULTANT FEE PROPOSAL |
May 19, 2005 |
|||
|
CONTRACT NEGOTIATIONS |
June 2, 2005 |
|||
| NOTICE TO PROCEED | June 16, 2005 | |||
| PRELIMINARY LINE & GRADE | April 1, 2006 | |||
| FINAL JOINT INSPECTION | November 1, 2006 | |||
| RIGHT OF WAY PLANS | March 1, 2007 | |||
| FINAL ROADWAY PLANS | October 1, 2008 | |||
The
selected consultant is expected to meet the scheduled milestone dates. |
||||
| EVALUATION
FACTORS |
75% - 100% of work accomplished in Kentucky offices – 2 points 26% - 74% of work accomplished in Kentucky offices – 1 point 0% - 25% of work accomplished in Kentucky office - 0 points |
|||
|
SELECTION COMMITTEE MEMBERS |
|
|||
|
DBE REQUIREMENT |
None | |||
|
SPECIAL INSTRUCTIONS |
The Department reserves the option to modify the selected consultant’s agreement to include any necessary services for this project. The firm(s) will be asked at that time for prequalificans by the Department in the required area(s).
|
|||
| SCOPE | 1. Conduct preliminary engineering studies to identify appropriate typical section, line and grade, and dependable cost estimate. The environmental document at this time is expected to be a CE Level 1 which will be done by district. 2. The selected Consultant will be required to provide engineering services to perform Phase II roadway design, including the preparation of any design studies, drainage design, right of way plans, construction plans, traffic control plans and cost estimates.
|
|||
| AVAILABLE KYTC STUDIES | N/A | |||
| PROJECT LENGTH | 0.1 Miles |
|||
| METHOD OF DESIGN | X CADD Capability (with DGN Intergraph Design File Format) X CADD Based Automated Highway Design System X Digital Terrain Modeling
|
|||
| ENVIRONMENTAL | Department shall perform Service. | |||
| PHOTOGRAMMETRIC SERVICES | Department shall perform Service. | |||
| STRUCTURE DESIGN | The selected consultant shall do the necessary engineering services to submit to the Kentucky Transportation Cabinet an Advance Situation folder(s) for the appropriate applicable structure(s). Upon submission of the folder(s), a determination will be made whether the structure design will be performed by the Department or by the consultant. in the area of structure design is required to be identified in the consultant's Response to Announcement. |
|||
| GEOTECHNICAL SERVICES | Department shall perform Service. |
|||
| PROJECT FUNDING | Federal Funds | |||
| UTILITY DESIGN | The
selected consultant may be requested to provide utility related services
for this project, which may include construction inspection. |
|||
| TRAFFIC | Traffic
projections and related information will be provided by the Department. |
|||
| PREQUALIFICATION REQUIREMENTS | The project team shall be prequalified in all areas as follows:
|
|||